Posted: Jul 23, 2004 6:25 pm Post subject: attaching handle to adjustable length lines
I have a handle and an adjustable line, do I want to attach the handle to the side that has all the removable sections or to the other side....as in which is it easier to remove sections from, the pylon side or the handle _________________ JMU
The side with the extensions goes on the pylon. The handle goes on the other side.
If you do it the other way, you would have to take the handle off every time you want to shorten your rope rather than just moving it one extension in on the pylon.
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You can download files in this forum